- Start with intended uses and appliances.
- Have the existing installation assessed before alteration.
- Plan completion checks and clear identification.
REFERENCES FOR YOUR PROJECT
Standards and rules in Algeria
References depend on the installation, premises use and equipment. A small visible addition may require a broader assessment.
Points to clarify with the professional
- Ask which rules apply to design, protection and the selected products.
- Have appropriate checks defined before return to service.
- Distinguish completed alterations from parts of the installation not assessed.
Explore the official references8 related references
A technical standard is not automatically compulsory. The approval text, nature of the work and contractual specifications determine which references apply.
Titles are translated for readability; these are not official document translations. Each reference also provides its original French title.
DTR E 10.1Rule applicable within its scopeInstallation of electrical systems in residential buildings
Electrical installations in residential buildings. The order of 29 December 2009 concerns new studies; specify the relevant scope and planned checks for the project.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2010
Official title in French
Travaux d’exécution des installations électriques des bâtiments à usage d’habitation
NA CEI 60364-1 (NA 1608)Technical referenceElectrical installations of buildings — Fundamental principles — Assessment of general characteristics — Definitions
General framework for electrical design. The catalogue lists the 2026 NA edition; check applicable legislation and the contract to establish project requirements.
- Organisation
- IANOR
- Edition or version
- 2026
Official title in French
Installations électriques des bâtiments — Principes fondamentaux — Détermination des caractéristiques générales — Définitions
NA CEI 60364-4-41 (NA 1808)Technical referenceLow-voltage electrical installations — Protection for safety — Protection against electric shock
Reference for protection against electric shock. Check its applicability; catalogue listing alone does not establish a regulatory obligation.
- Organisation
- IANOR
- Edition or version
- 2022
Official title in French
Installations électriques à basse tension — Protection pour assurer la sécurité — Protection contre les chocs électriques
NA CEI 60364-6 (NA 10102)Technical referenceLow-voltage electrical installations — Verification
Reference for agreeing electrical verification requirements with the professional. The edition is listed in the catalogue; mandatory status is not established here.
- Organisation
- IANOR
- Edition or version
- 2018
Official title in French
Installations électriques à basse tension — Vérification
NA CEI 60364-7-701 (NA 10103)Technical referenceLow-voltage electrical installations — Part 7-701: requirements for special installations and locations — Locations containing a bath or shower
Electrical coordination in rooms with a bath or shower. Have the electrician confirm applicable requirements; technical clearances cannot be inferred from the catalogue alone.
- Organisation
- IANOR
- Edition or version
- 2020
Official title in French
Installations électriques à basse tension — Partie 7-701 : exigences pour les installations et emplacements spéciaux — Emplacements contenant une baignoire ou une douche
IANOR documentation serviceGuide and recommendationsInformation centre
Use this service to check editions, amendments and relevant parts, then consult or obtain complete texts under IANOR's arrangements.
- Organisation
- IANOR
Official title in French
Centre d’informations
NA catalogueOfficial catalogueCatalogue of Algerian standards
Official inventory for further trade references. The catalogue does not replace complete standards or, by itself, establish that they are mandatory.
- Organisation
- IANOR
- Edition or version
- 30 June 2026 — version 1
Official title in French
Catalogue des normes algériennes
CNERIB catalogueOfficial catalogueList of publications for sale
Official catalogue of available DTR documents and guides. It identifies publications and editions; obtain the complete requirements from the publisher.
- Organisation
- CNERIB
- Edition or version
- Updated 14 January 2025
Official title in French
Liste des publications en vente
The references below concern the work described. Use the official catalogue to find product standards and additional references specific to the project. Some complete documents are distributed by their issuing organisation.
Ask the professional to identify the references relevant to the work, selected products and building. A technical standard is not automatically a regulatory obligation; check its scope and the stated source.
Sources consulted on
Define the intervention
Fault finding, additional outlets and installation renovation have different scopes. The professional identifies appropriate checks and solutions.
- Faults or repeated trips to investigate.
- Locations for sockets, lighting and appliance supplies.
- Assessment and renovation of an existing installation.
Describe how the property is used
Prepare these items
- Appliances and intended uses by room, with manuals when available.
- A plan or sketch of desired locations and photos taken without opening equipment.
- Symptoms, frequency and previous alterations.
- Occupied areas, access and acceptable power interruptions.
Compare the same scope
Clarify visible work, alterations to existing systems and reinstatement after routing cables.
Swipe the table to see all columns.
| Item | Agree |
|---|---|
| Equipment and layout | Quantity, locations and selected product references. |
| Cable routes | Installation method, openings, making good and finishes. |
| Checks and handover | Checks performed, identification and documents supplied. |
Organise the work
Assessment
The professional examines the intended uses and relevant installation.
Recorded choices
You agree the layout and necessary changes.
Work and verification
The planned checks follow installation, together with an explanation of the installed elements.
Discuss the handover
- Location and operation of the agreed equipment.
- Clear identification of the relevant elements.
- Explanation of the intervention limits and reported outstanding defects.
- Product documents and a record of checks included in the quotation.
What affects cost and time
The number of sockets alone cannot define the cost. Existing condition, cable routes, access and finishes affect the work. Intended appliances and coordination with other trades must be known before agreement.
Coordinate electrical work with the project
Share kitchen, air-conditioning or powered joinery layouts before closing walls. Electrical work belongs with a competent professional; this guide is not a fault-repair procedure.
- Masonry: openings and reinstatement of surfaces.
- Air conditioning and renovation: locations, supplies and order of work.
Your questions answered
Must everything be replaced to add an appliance?
Not automatically. The electrician needs to assess the appliance and installation before proposing a change.
Can I provide just the number of sockets?
Add their intended uses and locations. This helps assess the project and associated work.
Is filling cable chases included?
Specify it, together with the finish expected and who will carry out the work.
Submit my free request
Describe rooms, appliances and observed problems without working on the installation.