Key points
- Verify the business identity and who can bind it contractually.
- Request references that genuinely match your project.
- Clarify studies, insurance, teams and responsibilities.
Practical advice
Identify the party to your contract
Ask for the exact business name, professional address and registration document appropriate to the declared activity and legal status. Compare these with the quotation and the payment beneficiary’s account. An artisan, construction company, architect and developer do not operate under identical statuses. Have any difference in names explained before signing or paying.
Identify the authorized signatory and the person responsible for the site. A business card, stamp or social media message does not establish all these facts. The CNRC provides checks within its remit; some detailed information requires specific access.
Practical advice
Check comparable experience
Request examples close to your needs: bathroom renovation, roofing, a new building or structural repair. Establish the contractor’s actual role on each project. With the people concerned agreeing, speak to a previous client about organization, changes, finishes and how defects recorded at handover were addressed. An attractive photograph does not demonstrate the quality of concealed work.
For technical work, ask about the diagnostic method, documents to be produced and planned checks. A serious answer also identifies what must still be verified through a site visit or study. Treat a definitive structural conclusion based on a photograph alone with caution.
Legal reference
Distinguish professions and assignments
For projects requiring a building permit, article 55 of Law 90-29, as rewritten by Law 04-05, provides for joint preparation by an approved architect and engineer within the framework specified by the legislation. Identify the work actually commissioned: design, technical studies, supervision and construction. Technical control does not automatically replace design or daily supervision.
Request qualifications or approvals relevant to the proposed assignment and check their scope. Listing a business on NUMIDZIA PRO, or holding a platform subscription, does not by itself constitute professional approval, insurance or technical certification.
Procedure
Read insurance certificates and their limits
Request relevant certificates and check the insured name, covered activity, period, exclusions and project identification where necessary. If in doubt, contact the insurer through a verified channel. Insurance obligations and legal liability are different issues: an exemption from an insurance requirement must not be interpreted as an absence of liability.
Clarify who works as a subcontractor, who supervises the teams and whom to contact about a defect. The insurance guide explains these distinctions without assigning identical guarantees to every type of work.
Practical advice
Assess the proposal and availability
Request a detailed quotation after a visit whenever one is necessary. Compare quantities, materials, protective measures, deadlines, testing and waste removal. Ask for an explanation of an unusually low price or unexpected immediate availability. Choose commitments that are clear and verifiable for your specific project.
A large advance, artificial urgency, unexplained payment to a third party or a persistent refusal to provide documents are reasons to pause the commitment while clarifying the situation. Keep the correspondence and do not rely solely on verbal promises.
Practical advice
Before appointing a contractor
Record your checks in a dated file without publishing the professional’s private documents. Ask candidates the same questions so you can compare their answers. You will then be able to prepare the quotation and schedule more precisely.
Checklist
- Business identity and signatory’s authority checked.
- Suitable activity, references and skills.
- Assignments of the different participants identified.
- Relevant insurance certificates examined.
- Quote, schedule and site contact established.
- Payment beneficiary and supporting documents consistent.
Sources & reference texts
- Law 04-05: building design and control 04-05Source checked on
- Ordinance 95-07: construction insurance 95-07Source checked on
- Civil Code: works contracts and guarantees 75-58Source checked on
Templates & checklists
Practical template
Pre-signing checklist
Template to adapt — information to complete. Use this list before agreeing to the quotation.
Open the template
