- Have rooms and uses assessed.
- Plan units, connections and drainage.
- Distinguish installation, maintenance and repair.
REFERENCES FOR YOUR PROJECT
Standards and rules in Algeria
References may cover building performance, equipment, electricity and fluids. Applicability depends on the service selected.
Points to clarify with the professional
- Have equipment choice and positioning assessed for the building.
- Specify commissioning checks and manufacturer guidance.
- Identify requirements linked to fluids, electrical work and any shared areas.
Explore the official references8 related references
A technical standard is not automatically compulsory. The approval text, nature of the work and contractual specifications determine which references apply.
Titles are translated for readability; these are not official document translations. Each reference also provides its original French title.
DTR C 3.31Rule applicable within its scopeNatural ventilation — Residential premises
Natural ventilation of relevant dwellings under the order of 14 November 2005. Coordinate air inlets and windows; flues and smoke control are covered by other rules.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2006
Official title in French
Ventilation naturelle — Locaux à usage d’habitation
DTR C 3.2/4Technical referenceThermal regulations for buildings
Thermal design and heating/cooling needs. Edition approved on 30 July 2016; confirm its project scope. It replaces the former 1997 and 1998 documents.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2016 — 2nd edition
Official title in French
Réglementation thermique du bâtiment
NA 16935Technical referenceMechanical refrigerating systems used for cooling and heating — Safety requirements
Refrigeration safety reference listed by IANOR. Have its suitability checked for the refrigerant and equipment, together with applicable legislation and updates.
- Organisation
- IANOR
- Edition or version
- 2011
Official title in French
Systèmes frigorifiques mécaniques utilisés pour le refroidissement et le chauffage — Prescriptions de sécurité
NA 16936Technical referenceNon-ducted air conditioners and heat pumps — Testing and determination of performance characteristics
Testing reference for the equipment covered. Request documented manufacturer performance; sizing the installation for a room remains a separate study.
- Organisation
- IANOR
- Edition or version
- 2017
Official title in French
Climatiseurs et pompes à chaleur non raccordés — Essais et détermination des caractéristiques de performance
IANOR documentation serviceGuide and recommendationsInformation centre
Use this service to check editions, amendments and relevant parts, then consult or obtain complete texts under IANOR's arrangements.
- Organisation
- IANOR
Official title in French
Centre d’informations
CNERIB guideGuide and recommendationsPractical guide to flat roof insulation: design and installation
Additional practical guide for planning flat-roof insulation. The publication is listed in the catalogue; the guide alone does not establish a regulatory obligation.
- Organisation
- CNERIB
- Edition or version
- 2024 — 1st edition
Official title in French
Guide pratique sur l’isolation des toitures-terrasses : conception et mise en œuvre
NA catalogueOfficial catalogueCatalogue of Algerian standards
Official inventory for further trade references. The catalogue does not replace complete standards or, by itself, establish that they are mandatory.
- Organisation
- IANOR
- Edition or version
- 30 June 2026 — version 1
Official title in French
Catalogue des normes algériennes
CNERIB catalogueOfficial catalogueList of publications for sale
Official catalogue of available DTR documents and guides. It identifies publications and editions; obtain the complete requirements from the publisher.
- Organisation
- CNERIB
- Edition or version
- Updated 14 January 2025
Official title in French
Liste des publications en vente
The references below concern the work described. Use the official catalogue to find product standards and additional references specific to the project. Some complete documents are distributed by their issuing organisation.
Ask the professional to identify the references relevant to the work, selected products and building. A technical standard is not automatically a regulatory obligation; check its scope and the stated source.
Sources consulted on
Specify the request
New installation, maintenance and fault diagnosis are different services. The professional confirms operations suited to the equipment and situation.
- Equipment choice and positioning for the project.
- Maintenance of an identified, accessible appliance.
- Diagnosis of operating faults or unusual drainage.
Information to share
Prepare these items
- Rooms, approximate dimensions, exposure and occupancy.
- Photos of possible locations and access.
- Brand, model, known age and service history for existing equipment.
- Neighbour, façade and drainage constraints to examine.
Detail the installation
Swipe the table to see all columns.
| Element | Specify |
|---|---|
| Equipment | Model, characteristics, accessories and documents supplied. |
| Installation and connections | Positions, supports, routes, openings and finishes. |
| Electricity and drainage | Included work, interfaces and agreed solutions. |
| Commissioning and maintenance | Checks, guidance and scope of any follow-up. |
Plan the intervention
Needs assessment
Review rooms, uses, constraints and existing equipment.
Installation agreement
Agree locations and associated work before purchasing or drilling.
Commissioning
Plan suitable checks and operating and maintenance guidance.
Clarify the handover
- Operation and settings explained using the available controls.
- Routes and finishes matching the accepted project.
- Drainage and noise observed under the agreed checking conditions.
- Manuals, references and maintenance operations explained.
What changes the quotation
Outdoor-unit access, connection length and routes, support repairs, electrical supply and model availability affect the service. Floor area alone does not replace assessment of the need.
Coordinate before installation
Have façade or shared-area alterations assessed for the building. Coordinate supplies with the electrician and support repairs with other trades. Equipment and fluid handling remain with competent professionals.
Your questions answered
Can I buy the appliance before the visit?
Have its suitability and installation options confirmed before purchase.
Does maintenance include every repair?
Ask for the operations covered and how discovered defects or parts are handled. Maintenance and repairs may be quoted separately.
Does the quotation include electricity?
Clarify whether an existing supply will be used or separate electrical work is needed.
Submit my free request
Describe rooms, intended use and possible locations. For a fault, add the appliance reference.




