- Define uses and opening direction.
- Have measurements confirmed before fabrication.
- Specify installation and surrounding repairs.
REFERENCES FOR YOUR PROJECT
Standards and rules in Algeria
References concern the complete item, its components and installation. Material alone does not describe installed performance.
Points to clarify with the professional
- Identify declared characteristics and manufacturer documents.
- Specify references suited to installation, substrates and exposure.
- Assess glazing, powered systems and safety-related items separately.
Explore the official references9 related references
A technical standard is not automatically compulsory. The approval text, nature of the work and contractual specifications determine which references apply.
Titles are translated for readability; these are not official document translations. Each reference also provides its original French title.
DTR C 3.31Rule applicable within its scopeNatural ventilation — Residential premises
Natural ventilation of relevant dwellings under the order of 14 November 2005. Coordinate air inlets and windows; flues and smoke control are covered by other rules.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2006
Official title in French
Ventilation naturelle — Locaux à usage d’habitation
DTR E 5.1Rule applicable within its scopeWooden joinery works
Timber joinery within the DTR's scope. The order of 27 March 2004 requires its provisions for relevant new studies; specify use, substrate and acceptance.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2004
Official title in French
Travaux de menuiserie en bois
DTR E 5.3Rule applicable within its scopeExternal PVC joinery works
External PVC joinery. The order of 24 June 2024 applies to new studies from publication on 8 September 2024; check the performance specified in the quotation.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2024
Official title in French
Travaux de menuiseries extérieures en PVC
DTR E 7.1Rule applicable within its scopeGlazing and mirror installation works
Glazing installation within the DTR's limits. The order of 16 June 2013 applies to relevant new studies; specify glass type, location and safety requirements.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2014
Official title in French
Travaux d’exécution de vitrerie et de miroiterie
DTR C 3.2/4Technical referenceThermal regulations for buildings
Thermal design and heating/cooling needs. Edition approved on 30 July 2016; confirm its project scope. It replaces the former 1997 and 1998 documents.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 2016 — 2nd edition
Official title in French
Réglementation thermique du bâtiment
DTR E 5.2Technical referenceMetal joinery works
Installation and acceptance of the metal joinery covered. The catalogue edition is verified; confirm scope and legal conditions of application to the work.
- Organisation
- CNERIB / Ministry of Housing
- Edition or version
- 1998
Official title in French
Travaux de menuiserie métallique
IANOR documentation serviceGuide and recommendationsInformation centre
Use this service to check editions, amendments and relevant parts, then consult or obtain complete texts under IANOR's arrangements.
- Organisation
- IANOR
Official title in French
Centre d’informations
NA catalogueOfficial catalogueCatalogue of Algerian standards
Official inventory for further trade references. The catalogue does not replace complete standards or, by itself, establish that they are mandatory.
- Organisation
- IANOR
- Edition or version
- 30 June 2026 — version 1
Official title in French
Catalogue des normes algériennes
CNERIB catalogueOfficial catalogueList of publications for sale
Official catalogue of available DTR documents and guides. It identifies publications and editions; obtain the complete requirements from the publisher.
- Organisation
- CNERIB
- Edition or version
- Updated 14 January 2025
Official title in French
Liste des publications en vente
The references below concern the work described. Use the official catalogue to find product standards and additional references specific to the project. Some complete documents are distributed by their issuing organisation.
Ask the professional to identify the references relevant to the work, selected products and building. A technical standard is not automatically a regulatory obligation; check its scope and the stated source.
Sources consulted on
What would you like to make or replace?
Interior joinery, exterior joinery and fitted furniture meet different needs. Check that the professional works with the intended material and type of item.
- Doors, windows, shutters or closure elements.
- Wardrobes, storage and fitted interiors.
- Adjustment or replacement of existing elements after assessment.
Prepare choices and constraints
Prepare these items
- Photos of the opening or space with indicative dimensions.
- Use, preferred opening direction and available clearance.
- Desired appearance, material and fittings.
- Items to retain, delivery access and visible substrate condition.
Compare the complete item
Swipe the table to see all columns.
| Subject | Specify |
|---|---|
| Composition | Material, any glazing, hardware, fittings and finish. |
| Measurement and fabrication | Who takes final measurements and approves choices before ordering. |
| Removal and installation | Items retained, fixing method, junctions and surrounding repairs. |
| Handover | Adjustments, cleaning, waste removal and care instructions. |
From measurement to installation
Survey and use
Have dimensions and operating constraints confirmed.
Approval
Accept specifications, any drawing and scope boundaries.
Installation and adjustment
Plan checks of opening elements, accessories and agreed finishes.
Review the result
- Dimensions and position matching the approved choice.
- Opening, closing and accessories checked with the professional.
- Appearance and finishes compared with accepted references.
- Care instructions and adjustment limits explained.
Cost and production factors
Size, customisation, material, accessories and requested performance affect the quotation. Removal, difficult access and substrate repairs also matter. Agree timing from final approval of measurements and choices.
Plan adjacent work
Window-reveal repairs, painting or a motor supply may involve other trades. For a façade or shared area, have building-related procedures and approvals assessed before ordering.
Your questions answered
Are my measurements enough for fabrication?
They help prepare the request. Specify who checks and accepts the final measurements before fabrication.
Which material should I choose?
Explain expectations for use, maintenance, appearance and performance. Then compare complete items, including fittings and installation.
Is painting around a door included?
Specify surrounding repairs and finishes; they are not automatically part of installation.
Submit my free request
Describe the opening or fitted arrangement, intended uses and items to retain.